Раджан Еримбесов
Раджан Еримбесов
Раджан Еримбесов
Увеличить

Раджан Еримбесов

Алматы, Almaty Qalasy, Казахстан
Просмотр профиля пользователя ограничен.

К сожалению, Вы не можете просматривать всю информацию о пользователе, так как зашли на страницу, как незарегистрированный пользователь. Но Вы можете:

Зарегистрироваться или Войти

Контактная информация и статус

Просмотр профиля
пользователя ограничен.

Открыть доступ

  • Возраст
  • Адрес
  • E-mail
  • Телефон
  • Социальные сети
  • Профиль
  • Статус
Достижения
I am looking for a position of Construction Engineer, Design Engineer or Planning Engineer. I have seven years of experience in construction, workface planning, design engineering in various oil field sites in Kazakhstan both onshore and offshore. Good knowledge of local SNIPs, GOST’s, international design standards and codes. Excellent knowledge of various software/computer programs.
Опыт работы
7 лет и 5 месяцев
7 лет и 5 месяцев
  • настоящее время
    2017
    март
    1 год и 6 месяцев

    3GP Workface Planning Facilitator

    Fluor, 10 000 +

    3GP Workface Planning Facilitator at Fluor, Future Growth Project
    Tengiz oilfield, Kazakhstan,Mar 2017 – Present.
    • Future Growth Project (FGP) is a USD 40B plus expansion of the oil and gas facilities project, located in Tengiz, Kazakshtan.
    • Responsible for supporting Contractor WFP planners with the development and assembly of Installation Work Packages (IWPs), ensuring that safety, quality and efficiency at the Workface and that the broader principles as laid out in the Workface Planning Implementation Plan and in Exhibit H are considered in the planning process.
    • Responsible for reviewing IWP for completeness and accuracy and coordinated with Project Controls and Construction Management to ensure path of construction is being supported.
    • Responsible for continuous support of the IWP process form initial IWP scoping sessions through to the IWP close out.
    • Responsible for managing Constraints in O3 to ensure Material Constrains Status is actual and IWP’s can be released to the field in a timely manner
    • Responsible for checking material status in MatMan to ensure availability of materials.
  • 2016
    сентябрь
    2012
    октябрь
    3 года и 11 месяцев

    Work Face Planning Facilitator / Field Engineer

    JSC Kazakh Institute of Oil and Gas

    Workface Planning Facilitator at KING, Future Growth Project
    Tengiz oilfield, Kazakhstan, May 2015 – Sep 2016.
    • Responsible for coordinating the development of IWPs to ensure that safety, quality and efficiency at the Workface are considered in the planning process.
    • Responsible for Contractor’s development of IWPs and WFP Technicians subsequent assembly of IWPs in SmartPlant Construction (SPC).
    • Responsible for expediting clearance of any Company related constraints
    • Assisted Construction with SPC Support
    • Responsible for monitoring Material ETA’s in order to ensure Material Constraints Status is actual and IWP’s can be released to the field in a timely manner

    Field Engineer for Infield Haul Road at KING, Future Growth Project
    Tengiz oilfield, Kazakhstan, Oct 2012 - May 2015.
    • Responsible for engineering support to the Project and Construction Managers to assist in the achievement of project objectives, according to the plan/procedures.
    • Responsible for site walk-through, conducting field investigations, taking measurements, photos, preparation of sketches and reviewing drawings to answer RFIs from Contractors.
    • Responsible for review of Contractor and Vendor Drawings as per GOSTs & SNIPs requirements; Responsible for preparation of new and modification of the existing drawings using Micro Station, GIS and other software.
    • Responsible for preparation of MOC, bulk material commodity curves and monitoring status. Participated in the development of job packs with Piping and Tie-in group and other discipline engineers.
    • Responsible for conducting Injury and Incident Free (IIF) training sessions and assisting IIF related activities
  • 2012
    октябрь
    2012
    май
    5 месяцев

    Field Engineer Civil Structural Buildings

    Saipem SPA

    Kashagan oil field project is a USD 50B plus grassroots project, located in the Northern Caspian Sea in Kazakhstan.
    Responsible for monitoring construction / installation etc. progress and preparation of “AS BUILT” mark-ups, equipment drawings, civil, structural & fabrication drawings etc.
    Responsible for preparation Site Queries, Bill of Materials, Material Request Forms.
    Responsible for monitoring status of Job Cards, Site Instructions, and Site Queries.
  • 2012
    май
    2011
    май
    1 год

    Инженер-проектировщик

    Хилти Казахстан, ТОО

    Обеспечение применения в строительных проектах технологий Hilti (монтажные и анкерные системы) посредством взаимодействия со строительными и проектными организациями
    Обеспечение проектных организаций закрепленного региона необходимыми техническими и экономическими расчетами, подтверждающими обоснованность использования продукции Hilti
    Проведение расчетных работ по проектам
    Консультирование строительных и проектных организации по строительным технологиям и оборудованию
    Консультирование специалистов отдела продаж по оборудованию Hilti
    Демонстрация оборудования, проведение презентаций
  • 2011
    май
    2010
    октябрь
    7 месяцев

    Инженер-конструктор

    ТОО Проектный институт Базис-А

    Расчеты и выпуск чертежей монолитных железобетонных конструкций, оснований и фундаментов
    Выполнение проектных работ в срок под руководством руководителя группы.
Образование
Результаты тестов
Профессионалы

Интересуют
профессионалы

Интересен
профессионалам

Возможно Вы знакомы